Progress yesterday and this morning so far has been great. We got the two columns mostly built, but the fronts don't go on yet because we need to install some LEDs on the inside, as well as do some runic carvings on the front faces before they get glued on.
The little panels at the bottom are actually filled with concrete to hold them in place, and there's two PVC pipes that stick into the foam base that will get connected to rebar coming out of the ground. That way the whole thing will be secured the ground and the concrete puts weight on it and acts as ballast to keep the entire structure from blowing away in the wind.
Err, well, at least that's the plan. :P