Duration: 1:43:20 - 88.8% of our footage was cut (though that's including a lot of audio waiting for Brian to drive.)
I doubled back through this while the footage was still on my immediate hard drive. Talk about a weird one, first ep fully shot at the MRHQ and every segment had radically different lighting conditions. I cut out some of the waiting around while Brian was out driving, but you can see some of the navigating around sponsor stipulations, the production crew trying to keep up with the guys running around the Jeep, and Bryce trying the pork. It was quite exhausting, and luckily the part this doesn't show is the unrelenting force of mosquitoes at the HQ.
Brandt H. -- editor, camera operator