This FPE clocks in at 0:38:04, with 70.5% of our footage hitting the cutting room floor.
A collaboration with the Hak5 crew was basically a foregone conclusion at a certain point, so it might come as little surprise that we had Shannon over to the HQ at the start of November for some episodes. This was actually the second video we recorded that day, but the first didn't pan out how we had all expected. That said we've got 2 more to cut together that dive a little bit more into the tech side of things, and a guest interview!
Brandt H. -- editor, camera operator