FPE: https://youtu.be/8O889zBbTRI
Original Episode: https://youtu.be/WSSTMAPxmAM
At 2:03:39, 79.8% of our footage hit the cutting room floor.
Got a chance to catch this odd Monday episode yet? This was a relatively quick turnaround, the episode was shot just a little over a week ago and delayed a few days due to sponsor obligations.
There's plenty in here that you won't have seen in the episode itself, like the resolution to the safety incident, figuring out how to pivot that moment into an ad, a lot of letting camera ops move around and re-position (some of us were operating up to 4 cameras at once), some good jokes, and there's even a set of slowed footage at the very end trimmed to all of the shots.
Brandt H. -- editor, camera operator